Projects

Projects in 2025

Clients and Project Description:

  • Relay protection testing, high voltage (110 kV) switchgear testing, transformer testing
  • Ivovik wind farm complience testing
  • EPS RHE Bajina Bašta High voltage (220 kV) line differential protection commissioning
  • Solar power plants system protection testing (multiple plants)
  • 854 MW Maestrale ring wind farm medium voltage cabling design
  • Vinča power plant relay protection testing, transformer and generator insulation testing
  • GSP Rectifier station MV switchgear installing and commissioning
  • 50 MW Bikovo solar power plant medium voltage design
  • Solar power plant relay protection and power quality testing
  • LV and MV switchgear installing and commissioning, transformer commissioning
  • Rooftop solar power plant 130 kW design, installing, testing and commissioning
  • Co-generation power plants relay protection testing and debugging
  • Execution of compliance tests to verify solar power plant (SPP)

Projects in 2024

Clients and Project Description:

  • Study of connecting Solar Power Plant Borike
  • Solar Power Plant Bor4 and Lianshao documentation check, consulting during functional testing
  • FGD TENT A commissioning completion
  • Adjustment and regular testing of relay protection for cement plant
  • Calculation and verification of TEKO B3 protection settings
  • Solar Power Plant 10 MW complete equipment testing (cables, circuit breakers, grounding, switchgear, relay protection, SCADA signals etc.)
  • Regular testing of relay protection and switches for cement plant
  • Commissioning of 092 system in TEKO B3
  • Additional calculation for FNE Borike
  • Calculation of MV protection for 092 system in TEKO B3
  • Soft starters for 092 system in TEKO B3
  • Testing of relay protection at SE Terasteel Leskovac
  • Testing of relay protection in IS GSP according to the tender
  • Design of cable network project Maestrale Ring
  • Study of Solar Power Plant Modrin
  • Signal testing of 091 system at TEKO B3
  • FAT testing at HPP Rovni
  • Testing of protection functions at Solar Power Plants BEP 1 and 2 Boljevac
  • Conceptual design of Solar Power Plant MegaMont 120 kW in Kraljevo
  • Testing of generator protections at Thermal Power Plant Morava
  • Testing of relay protection in 110/35 kV substation
  • Testing of relay protection at Solar Power Plant Pobeda Leskovac
  • Preparation of technical documentation for the replacement of 220 kV switches at HPP Bistrica
  • Commissioning of the heating system power supply 6 kV at TPP Kostolac A
  • Testing of relay protection at TS GSP according to the tender
  • Purchase and installation of 10 kV switchgear at GSP Belgrade
  • Purchase and installation of MV DC switchgear at GSP Belgrade
  • Project design of 110 kV busbar protection with relay protection testing
  • Project design and retrofit of generator protections at Thermal Power Plant Kostolac A

Projects before 2024

1. Inspections at TPP Afrin/Elbistan Afisan after earthquake. Evaluation for electrical part including condition of generator, condition of main transformer (replacement of oil and cooling system, condition of generator protection, main transformer protection and auxiliary transformer, excitation system and MV an LV switchgear and FGD facility).

2. Evaluation of rehabilitation of TPP Bander Abas in Iran electrical part (replacement) including condition of generator (replacement), condition of main transformer (testing and replacement of oil and cooling system,replacement of generator protection, main transformer protection and auxiliary transformer (coordination with excitation system and network protection)

3. Relay protection study of 110/11 kV transformers and 110 kV transmission lines (Vinča – Belgrade 20) in PRP Vinča

4. Study analysis of the possibility of connecting to the transsmission grid the five solar power plants to the transmission system in Bosnia.

5. Study of electrical protection with the calculation of the water pump station Savski trg

6. Calculation of electrical protection settings of the 35 kV distribution facility in „THE STATE CENTER FOR DATA MANAGEMENT AND STORAGE “DATA CENTER” – KRAGUJEVAC“

7. Installation and commisioning of relay protection devices (EFACEC) within RP 35 kV “Dolac” within TS 35/10 kV “Dolac”

8. Factory testing of autotransformers 300/300/100 MVA, 400+-8×1.25%/115/10.5 kV”, for the substation Podgorica 2 (Tološi) Montenegro, in the following items

9. Testing for for two autotransformers 400/110 kV, 300 MVA, Chint Electric Co., Ltd., type OSFPSZ-300000/400 Montenegro

10. Tests on the protection and transformers and other electrical maintenance for cement plants of Lafarge Holcim in Serbia

11. Construction Project for Flue Gas Desulfurization systems on unit A3, A4,A5 and A6, TPP Nikola Tesla, Serbia, protection electrical issues, commissioning team – electrical equipment specialist team,functional testing and Commissioning

12. Consultancy Services for 33kV Network Expansion to connect Abu Al Abyad Primary to the Central Grid Station, together with 11kV & LV Augmentation and Reinforcement at Abu Al Abyad in The Western Region of Abu Dhabi. The client and the owner of island is H.H. Sheikh Khalifa Bin Zayed Al Nahyian the President of United Arab Emirates.

13. Consultancy Services Kahramaa (Qatar General Electricity and Water Company) Project Phase VIII (GTC 06/143 OHL), Consultancy Services for establishment of HV OHL (220kV and 400kV) and modifications on 132/66kV OHL’s.

14. Regular testing and maintenance of protection systems for 110 kV and 6 kV facilities

15. Commissioning and testing of diesel generators (relay protection and PMS)

16. Germany, Spain, Poland, China, Egypt etc – Commissioning and testing of protection systems and PMS at the vessels SS

17. Regular testing and maintenance of protection systems for 110 kV, 20 kV, and 6 kV facilities, Installation and commissioning of protection systems for 20 kV and 6 kV

18. Regular testing and maintenance of protection systems for 110 kV and 6 kV facilities

19. Regular testing and maintenance of protection systems for 110 kV lines

20. Maintenance of protection systems and circuit breakers for 6 kV

21. Regular testing and maintenance of protection systems for 110 kV and 6 kV facilities

22. Commissioning and testing of diesel generators, auxiliary transformers, insulation testing, voltage and current sensor testing on HVDC (500 kV), SF6 gas testing and leakage detection

23. Regular testing and maintenance of protection systems for 110 kV and 6 kV facilities

24. Commissioning and testing of AVR for transformers 110/35 kV

25. Regular testing and maintenance of protection systems for 20 kV windfarm facilities

26. Regular testing and maintenance of protection systems for 20 kV windfarm facilities

27.Design of 22 kV and 0.4 kV distribution for data center power supply, calculation of relay protection settings, development of selectivity studies, creation of protection device configurations

28. Commissioning and testing of relay protection for train line 25 kV

29. Commissioning and testing of protection systems 6 kV facilities